Assignment 10.0
- Collect 3 images that represent the Field condition
- For each image, create a trace line drawing
- Based on the line, produce an abstracted pattern drawings by understanding and extracting the essence of the pattern
- Lay them out on 11x17in
- Upload all 9 images to the Google drive
Assignment 10.1 Canopy Sketches + Sketch Models
Based on the inspiration from field condition, draw a lot of canopy sketches. Based on a promising idea, build a physical model. We will discuss the constructability of the canopy in the following week.
Assignment 10.1 Parts prototype for the canopy
Design a new process of digital fabrication by mixing more than 2 methodologies. The size of the model is approximately 6 – 10 inch square cube, depending on the methodology. This will be a prototype for your final canopy model.
General Schedule For DP02
- W11 Desk Crits for canopy / Exploded tutorial
- W12 Design Final for the canopy – 3D Print file needs to be submitted
- W13 Documentation crits / Final Video crit
- W14 Final Presentation
Parts Axonometric Video
Download 3D model here
- Set the view to Parallel mode
- Copy the entire object to another layer
- In the original layer, start separating pieces in different ways
- Make sure direction of explosion has some rhyme and reason
- Adjust your axonometric view and object placement to eliminate overlapping of objects
- Make 2D, and correct lineweights
DP02 Final Requirements
Canopy
PDF Presentation on Week 14
- Inspiration
- Design Story
- Process sketches/models
- Final Sketch
- In-Situation Rendering
- Detail Renderings
- Detail / Exploded Drawing with Dimensions
- Model Photos
ENV 2 Twinmotion Video
- A 60-second video walk-through of the space.
- Video Motion needs to be extremely smooth
- Constant eye-level
- Do not turn around or move too much
- Simple Music
For Week 12
Canopy
- Finalized fabrication model for review
- Canopy file needs to be submitted between W12-W13